The development of effective solutions to seal gaps at service penetrations has increased over the past few years and Promat has become a world leader in supplying such solutions. Note should be taken that every service passing through fire resistant building elements react in different ways to fire, so there is no single solution or product that will protect all services.
General Design Considerations
As penetrations can occur in various building elements, there are a number of important criteria that require consideration in determining the appropriate type of sealing system to be used.
- Performance criteria
- Insulation requirement
- Thermal expansion
- Horizontal/vertical orientation
- Wall/floor/linear gap
- Mechanical strength
- Fire resistance period
- Movement or Vibration
- Loadbearing
- 240 minutes fire resistance for Concrete floor, Partition or Wall
FRL -/240/180
PROMASEAL® Retrofit Collars
- 240 minutes fire resistance for Ceiling, Concrete floor, Partition or Wall
FRL -/240/240
PROMASEAL® Wall Collar
- 120 minutes fire resistance for Partition or Wall FRL -/120/120
PROMASEAL® Hi-Blu Collar
- 240 minutes fire resistance for Concrete floor FRL -/240/180
PROMASEAL® Green Cast-In Collar
- 240 minutes fire resistance for Concrete floor FRL -/240/240
PROMASEAL® Floor Waste Collar
- 240 minutes fire resistance for Concrete floor FRL -/240/180
PROMASEAL® Fire Resistant Services Seal Collar
- 240 minutes fire resistance for Concrete floor FRL -/240/240
PromaSnap® Floor Waste System
- 120 minutes fire resistance for Concrete floor FRL -/120/120
PROMASEAL®-A Acylic Sealant
- 240 minutes fire resistance for Ceiling or Floor FRL -/240/-
- 180 minutes fire resistance for Partition or Wall FRL -/180/-
- 240 minutes fire resistance for Control Joints & Penetration Seals
in Ceiling, Floor, Partition or Wall FRL -/240/240
PROMASEAL® Bulkhead Sealer System
- 120 minutes fire resistance for Concrete floor or Wall FRL -/120/120
PROMASEAL® FyreStrip
- Up to 240 minutes fire resistance for Ceiling or Floor FRL -/240/240
- Up to 240 minutes fire resistance for Partition or Wall FRL -/240/240
PROMASEAL® FlexiWrap
- 240 minutes fire resistance for Ceiling or Floor FRL -/240/120
- 240 minutes fire resistance for Partition or Wall FRL -/240/120
PROMASEAL® IBS™
- 240 minutes fire resistance for Ceiling or Floor FRL -/240/240
- 240 minutes fire resistance for Partition or Wall FRL -/240/240
PROMASEAL® Electrical Junction Seal
- Up to 240 minutes fire resistance for Ceiling or Floor FRL -/120/120
- Up to 240 minutes fire resistance for Partition or Wall FRL -/120/120
PROMASEAL® Mortar
- 240 minutes fire resistance for Floor FRL -/240/180
- 240 minutes fire resistance for Wall FRL -/240/240
PROMASEAL® Pillows
- 180 minutes fire resistance for Floor or Wall FRL -/180/120
PROMASEAL® Switchbox Intumesent
- 120 minutes fire resistance for Switchbox FRL -/120/120
- 240 minutes fire resistance for Concrete floor, Partition, or Wall
FRL -/240/240
PROMASTOP® Cement
- 240 minutes fire resistance for Floor FRL -/240/240
- 240 minutes fire resistance for Loadbearing Floor FRL 240/240/240
- 240 minutes fire resistance for Wall FRL -/240/240